Projects-1

Projects

METRO STATIONS DUBAI

Installation, Testing & Commissioning of internal and external communication systems

for several Metro stations (Inst. for 19 & testing & commissioning for 29 in total):

  • CCTV System
  • MMS (Multi-Media Service System)
  • FON (Fibre Optic Network)
  • IAS (Intelligent Access System)
  • TNS (Telephone Network System)
  • TDS (Time Domain System)
  • PAS (Passenger Address System)
  • PIS (Public Information System)
  • BBRS & NBRS (Broad Band/Narrow Band Radio System)
  • OBS (On Board System)

Client: Thales

Location: Dubai, UAE

 

AL AIN HOSPITAL

  • Supply, Installation, Testing & Commissioning of:
  • Lightning Protection System
  • Risk Assessment Plan
  • UPS System for Emergency Clinics in Basic Health Unit GRP Room for outdoor UPS equipment
  • Lightning Protection & Risk Assessment for total 21

Al Ain Hospital Buildings

Client: Al-Ain Hospital

Location: Al-Ain, UAE

 

DUBAI AIRPORT C3 EXPANSION

Supply, Installation, Testing & Commissioning

  • SCN (Structured Cabling Network)
  • PAS (Public Address System)
  • FTTO Installation and Termination
  • Enclosure Splicing
  • FON (Fiber Optic Network)
  • Fiber Cable Pulling (300 KM)
  • Power Cable Pulling (100 KM)

Client: Thales

Location: Dubai, UAE

AIRPORT INSTALLATIONS

JINNAH INTERNATIONAL AIRPORT – KARACHI

  • Complete Installation of Fixed GPUs (400Hz) for 2 satellites
  • Cable Laying, Terminations, Supply & Inst. of Cable Trays
  • Installation of 400Hz Power Cable Reeler System
  • Installation of New LV Panel along with LV cables for GPUs
  • Design & Installation of new security fence lighting system
  • Up-gradation & replacement of existing HV and LV system around Jinnah International Airport Complex

QUETTA INTERNATIONAL AIRPORT

  • Installation of Control Cables & Distribution system along with ATS /AMF arrangement for ILS system 

Client: Pakistan Civil Aviation Authority 

Location: Karachi & Quetta, Pakistan

ETISALAT

Supply, Installation, Testing & Commissioning of:

  • VFD Systems for Air Handling Units
  • Up gradation of old VFDs with the new VFDs
  • Integration of all VFD panels with existing BMS system 

Client: Etisalat 

Location: Dubai, UAE

HUBCO POWER PLANT

4 x 323MW HUBCO Power Project:

  • MV, LV & control cable laying & testing
  • Termination and testing of 6.6KV cables on all four (Total no. of terminations = 567)
  • Termination and Testing of LV cables
  • Termination and Testing of control cables for 
  1. a) Marshaling boxes (all 4 units) 
  2. b) Boiler Control Panels (all 4 units) 
  3. c) Main Control Panels (Mimic Boards) 
  4. d) Field instruments Supply of electrical installation material for plant 

Client: Ansaldo Energia 

Location: Pakistan

YAS MALL 

Installation, Testing & Commissioning of:

  • Small Light & Power Works
  • SCN (Structured Cabling Network)
  • PAS (Public Address Systems)
  • ACS (Access Control Systems)
  • CCTV Systems 

Client: Voltas 

Location: Abu Dhabi, UAE

KAPCO 125 MW PROJECT UNIT NO. 11

Installation, Testing & Commissioning of 132 KV/11 KV Sub Station

  • MV, LV and Control Cable Laying, Termination and Testing
  • Installation of LV equipment, Cable Trays
  • Installation of Grounding & Lightning Protection System
  • Wiring of light Panel, Isolators & Industrial Outdoor Boxes 

Client: WAPDA 

Location: Pakistan

Steelman © 2024. All rights reserved.