HUBCO POWER PLANT
Termination and Testing of cables at HUBCO Power Project (4 x 323MW):
- MV, LV & control cable laying & testing
- Termination and testing of 6.6KV cables on all four (Total no. of terminations = 567)
- Termination and Testing of LV cables
- Termination and Testing of control cables for
- Marshaling boxes (all 4 units)
- Boiler Control Panels (all 4 units)
- Main Control Panels (Mimic Boards)
- Field instruments Supply of electrical installation material for plant
Client: Ansaldo Energia