HUBCO POWER PLANT

Termination and Testing of cables at HUBCO Power Project (4 x 323MW):

  • MV, LV & control cable laying & testing
  • Termination and testing of 6.6KV cables on all four (Total no. of terminations = 567)
  • Termination and Testing of LV cables
  • Termination and Testing of control cables for 
  • Marshaling boxes (all 4 units)
  • Boiler Control Panels (all 4 units) 
  •  Main Control Panels (Mimic Boards) 
  • Field instruments Supply of electrical installation material for plant 

Client: Ansaldo Energia
Location: Pakistan